As the technology of energy storage batteries continues to improve, and energy demand increases, the number of gridscale energy storage is also increasing.
The two most critical indicators of an energy storage system are power and capacity. However, regarding capacity allocation, there are various understandings, such as rated capacity, nominal capacity, installed capacity, discharge capacity, charge capacity, etc.
Regardless of the capacity, the configuration and cost of different capacities are very different. The following introduces the interpretation and configuration instructions of different power plant capacities.
Installed capacity/rated capacity/nominal capacity
The output capacity of the lithium battery from fully charged to the end-of-discharge voltage;
Installed capacity = rated capacity = nominal capacity, in order to facilitate the calculation of the following capacity, this paper uses En to represent.
If the user has no special instructions, it is generally configured according to the rated capacity. Take the 2.5MW/5MWh energy storage system as an example:
● Batteries: lithium iron phosphate batteries commonly used in electrochemical energy storage power stations, with a battery capacity of 280Ah and a rated voltage of 3.2V;
● PACK: At present, the mainstream uses 280Ah cells, and the PACK is designed in series, regardless of the internal parallel connection of the PACK, such as 1 parallel 14 series, 1 parallel 24 strings, 1 parallel 48 strings, 1 parallel 52 strings and other schemes; this article uses 1P16S as an example, the specification of a single PACK is 51.2V, 14.336kWh;
● Battery cluster: Multiple PACKs are connected in series to form a battery cluster. According to the 1500V system design, the voltage range of the battery cluster needs to be between 800V~1500V/1000V~1500V (matching the voltage range of the DC side of the PCS).
The conventional scheme connects 25 PACKs in series, the rated voltage after series connection is 1280V, and the rated capacity is 358.4kWh;
● Battery stack: A collection of batteries connected to the same power conversion system that can control power input and output as a whole. A conventional 2.5MW/5MWh energy storage system consists of two 1250kW PCSs connected in parallel on the AC side.
The specification of a single battery stack is 1.25MW/ 2.5MWh, equipped with 7 battery clusters, the DC side of the 7 battery clusters is connected in parallel to a unified PCS, and the capacity of the battery stack is 2508.8kWh;
● Battery system: Two battery stacks are connected in parallel on the AC side, with a rated capacity of 5017.6kWh.
Discharge capacity
There are many opinions on the discharge capacity, which mainly depends on the location of the assessment point, such as: DC side discharge capacity, PCS AC side discharge capacity, and grid-connected point discharge capacity.
● DC side discharge capacity
If the user requires the discharge capacity of the DC side to be 5MWh, the discharge efficiency of the battery system and the charge and discharge depth of the battery system (considered at 90% DOD) need to be considered when configuring the capacity.
The actual configured capacity should be:
En-dc=5000kWh÷Battery system discharge efficiency÷DOD=5000kWh÷95.92%÷90%≈5791.86kWh.
Note: The battery system efficiency of some enterprises can be made higher, and the initial DOD can be calculated as 100%. If necessary, it can be calculated proportionally.
● PCS AC side discharge capacity
On the basis of the DC side discharge capacity, taking into account the DC side line loss and PCS efficiency, the configuration capacity when the user requires the PCS AC side discharge capacity is:
En-ac1=En-dc÷DC side line efficiency÷PCS inverter efficiency=5791.86kWh÷99.83%÷98.5%≈5890kWh.
● Grid-connected point discharge capacity
On the basis of the PCS AC side discharge capacity, taking into account the PCS AC side line loss, transformer efficiency and 35kV line loss, the configuration capacity when the user requires the grid-connected point discharge capacity is:
En-ac2=En-ac1÷PCS AC side line efficiency÷transformer efficiency÷35kV line efficiency=5890kWh÷99.98%÷98.98%÷99.89%≈5958.44kWh.
Note: Some projects require the PCS integrated machine to be equipped with an auxiliary power transformer, that is, the power used in the battery compartment and the PCS compartment is taken from the transformer, not from the station transformer.
At this time, it is necessary to increase the power consumption of auxiliary equipment when calculating the discharge capacity of the grid-connected point.
● Common connection point discharge capacity
On the basis of the discharge capacity of the AC side of the grid-connected point, taking the auxiliary power consumption into consideration, the configuration capacity when the user requires the discharge capacity of the public connection point is:
EOFF=En-ac2+Auxiliary equipment power consumption=5958.44kWh+60.3kW×2h=6079.04kWh
Charging capacity
There are also many opinions on the charging capacity, such as: DC side charging capacity, PCS AC side charging capacity, and grid-connected point charging capacity.
● DC side charging capacity
If the user requires the charging capacity of the DC side to be 5MWh, that is, the meter data on the DC side reaches 5MWh. When configuring the capacity, it is necessary to consider the charging efficiency of the battery system and the charging and discharging depth of the battery system (considered according to 90% DOD). Then the actual configured capacity should be:
En-dc=5000kWh×battery system charging efficiency÷DOD=5000kWh×95.92%÷90%≈5328.89kWh.
Note: The battery system efficiency of some enterprises can be made higher, and the initial DOD can be calculated as 100%. If necessary, it can be calculated proportionally.
● PCS AC side charging capacity
On the basis of the charging capacity of the DC side, taking into account the line loss of the DC side and the efficiency of the PCS, the configuration capacity when the user requires the charging capacity of the AC side of the PCS is:
En-ac1=En-dc×DC side line efficiency×PCS inverter efficiency=5328.89kWh×99.83%×98.5%≈5240.03kW
● Charging capacity of grid-connected point
On the basis of the PCS AC side charging capacity, taking into account the PCS AC side line loss, transformer efficiency and 35kV line loss, the configuration capacity when the user requires the grid-connected point charging capacity is:
En-ac2=En-ac1×PCS AC side line efficiency×transformer efficiency×35kV line efficiency=5240.03kWh×99.98%×98.98%×99.89%≈5179.84kWh.
Note: Some projects require the PCS integrated machine to be equipped with an auxiliary power transformer, that is, the power used in the battery compartment and the PCS compartment is taken from the transformer, not from the station transformer.
At this time, when calculating the charging capacity of the grid-connected point, it is necessary to subtract the power consumption of the auxiliary equipment.
● Common connection point charging capacity
On the basis of the charging capacity of the AC side of the grid-connected point, taking the auxiliary power consumption into consideration, the configuration capacity that can be configured when the user requires the charging capacity of the public connection point is:
EON=En-ac2-Auxiliary equipment power consumption=5179.84kWh-60.3kW×2h=5059.24kWh.
Summary
For energy storage capacity, there is still a lack of unified regulations; for industrial and commercial energy storage systems projects, due to the relatively clear business model, users are actually more concerned about the discharge capacity of public connection points.
For renewable energy supporting energy storage projects, due to unclear business models, energy storage allocation is mainly guided by policies. The user configures energy storage to complete photovoltaic grid connection, so it is natural to configure as little as possible, so it is often configured according to the rated capacity.
In addition, the above analysis is the initial capacity, not the capacity in the first year, let alone the capacity in the whole life cycle. When considering factors such as the operation mode, charge and discharge times, battery decay rate, and battery consistency during the operation period, further over-provisioning is required.